Skip to main content

Guide: Run Schedule & Schedule History

Follow the steps below to manually run and check the details of a Report Schedule

Updated this week

Run Schedule

  1. If you would like to run the Schedule to generate the attached Reports, you can do so via the Run Schedule button. Click on your Schedule and you'll see the button on the top bar

  2. On the pop-up, you will be able to Skip delivery - this will prevent the Reports from being sent to the associated email addresses. You'll be able to download this via Schedule History

    If you want the Schedule to send as normal, unselect this option.


Show Schedule History

  1. If you want to see the history of a Schedule's status, you can do so via the Show Schedule History button:

  2. A side window will appear that will display showing:

    1. The last 31 days worth of statuses

    2. When the Schedule Started and Finished At

    3. Any detail about why it may have failed

    4. A Download option

  3. The person icon dictates a Run Schedule was triggered, with the User displayed when hovering over the icon:

  4. You'll also be able to Download the Reports, via the icon on the right-hand side. Clicking on it will display all corresponding Reports, and for whichever you want to download, you click on the name of that Report:

Did this answer your question?